View the Toowoomba Regional Planning Scheme

Overview

As part of the Toowoomba Region Futures (TRF) Program we are preparing a new planning scheme. Learn more about the project here.

The Toowoomba Regional Planning Scheme guides what can be built and how land is used in the Region. It shapes how we live and the environment around us. 

The planning scheme responds to the changing needs of the community. It is amended as necessary, can be modified by Temporary Local Planning Instruments and is reviewed regularly.

The current Toowoomba Regional Planning Scheme version 29 took effect on 21 July 2026.

View planning scheme maps

Current planning scheme

The current planning scheme can be viewed and downloaded as either a PDF or Word version.

Word documents

Citation and Commencement v29(DOC, 896KB)                           

Part 1 About the Planning Scheme v29(DOC, 416KB)                   

Part 2 State Planning Provisions v29(DOC, 114KB)

Part 3 Strategic Framework v29(DOC, 362KB)

Part 4 Local Government Infrastructure Plan v29(DOCX, 130KB)       

Part 5 Tables of Assessment v29(DOCX, 473KB)             

Part 6  Zone Codes v29(DOC, 60MB)                                            

Part 7 Local Plans v29(DOCX, 5MB)                                          

Part 8 Overlays v29(DOC, 6MB)                          

Part 9 Development Codes v29(DOCX, 10MB)                        

Part 10 Other Plans v29(DOCX, 73KB)                           

Schedule 1 Definitions v29(DOCX, 216KB)                 

Schedule 2 Mapping v29(DOC, 105KB)

Schedule 3 Local government infrastructure plan mapping and tables v29(DOCX, 204KB)

Schedule 4 Notations required under the Planning Act 2016 v29(DOCX, 96KB)

Schedule 5 Designation of premises for development v29(DOC, 165KB)

Schedule 6 PSP1 Development Application Requirements v29(DOC, 4MB)

Schedule 6 PSP2 Engineering Standards Roads and Drainage Infrastructure v29(DOC, 15MB)       

Schedule 6 PSP 3,4,5,6,7 and 8 v29(DOC, 11MB) - includes PSP3 Engineering Standards – Water Waste and Infrastructure, PSP4 Master Planning, PSP6 Heritage Places, PSP7 Neighbourhood Character Places, PSP8 Street Trees

Schedule 7 Approved Plans of Development v29(DOC, 105KB)

Appendix 1 Index and Glossary of abbreviations and acronyms v29(DOC, 148KB)

Appendix 2 Table of Amendments v29(DOC, 158KB)

Appendix 3 TRC Road Hierarchy v29(DOCX, 75KB)   

Planning scheme update

On Tuesday 20 May 2025, Council resolved to make a declaration in accordance with section 8(1)(b)(i) of the Building Regulation 2021:

For the purposes of section 8(1)(b)(i) of the Building Regulation 2021, Council declares by resolution that, for all of the designated flood hazard area, the defined flood level is to be the 'flood planning level' as identified in the Flood Hazard Overlay Code of the Toowoomba Regional Planning Scheme (version 29, and as may be amended from time to time).

Past planning schemes

The planning schemes below have been superseded. PDF and Microsoft word versions are provided where available.

Planning Scheme version 28 (28 November 2022)

PDF documents

Citation and Commencement v28(PDF, 322KB)

Part 01 About the PS v28(PDF, 360KB)

Part 02 State planning provisions v28(PDF, 124KB)

Part 03 Strategic Framework v28(PDF, 510KB)

Part 4 Local Government Infrastructure Plan v28(PDF, 333KB)

Part 5 Tables of assessment v28(PDF, 3MB) 

Part 6 Zone Codes v28(PDF, 5MB)

Part 7 Local plans v28(PDF, 6MB)

Part 8 Overlays v28(PDF, 3MB)

Part 9 Development codes v28(PDF, 17MB)

Part 10 Other plans v28(PDF, 99KB)

Sched 1 Definitions v28(PDF, 576KB)

Sched 2 Mapping v28(PDF, 119KB)

Sched 3 Local government infrastructure plan mapping and tables v28(PDF, 464KB)

Sched 4 Notations required under the Planning Act 2016 v28(PDF, 222KB)

Sched 5 Designation of premises for development v28(PDF, 247KB)

Sched 6 PSP1 Development Application Requirements v28(PDF, 2MB)

Sched 6 PSP2 Engineering Standards Roads and Drainage Infrastructure v28(PDF, 10MB)

Sched 6 PSP 3, 4, 5, 6, 7 & 8 v28(PDF, 4MB)

Sched 7 Approved Plans of Development v28(PDF, 186KB)

Appendix 1 Index and glossary of abbreviations and acronyms v28(PDF, 218KB)

Appendix 2 Table of amendments v28(PDF, 198KB)

Appendix 3 TRC Road Hierarchy v28(PDF, 109KB)

Microsoft Word documents

Citation and Commencement v28(DOC, 895KB)

Part 1 About the PS v28(DOC, 422KB)

Part 2 State planning provisions v28(DOC, 115KB)

Part 3 Strategic Framework v28(DOC, 382KB)

Part 04 Local Government Infrastructure Plan v28.0(DOCX, 128KB)

Part 05 Tables of assessment v28(DOCX, 474KB)

Part 06 Zone Codes v28(DOC, 60MB)

Part 07 Local plans v28(DOCX, 5MB)

Part 08 Overlays v28(DOC, 6MB)

Part 09 Development codes v28(DOCX, 10MB)

Part 10 Other plans v28(DOCX, 72KB)

Sched 1 Definitions v28(DOCX, 214KB)

Sched 2 Mapping v28(DOC, 105KB)

Sched 3 Local government infrastructure plan mapping and tables v28(DOCX, 182KB)

Sched 4 Notations required under the Planning Act 2016 v28(DOCX, 94KB)

Sched 5 Designation of premises for development v28(PDF, 2MB) (PDF only)

Sched 6 PSP 1 Development Application Requirements v28(PDF, 10MB) (PDF only)

Sched 6 PSP 2 Engineering Standards Roads and Drainage Infrastructure v28(PDF, 186KB) (PDF only)

Sched 6 PSP 3, 4, 5, 6, 7 & 8 v28(DOC, 9MB)

Sched 7 Approved Plans of Development v28(DOC, 105KB)

Appendix 1 Index and glossary of abbreviations and acronyms v28(DOC, 149KB)

Appendix 2 Table of amendments v28(DOC, 160KB)

Appendix 3 TRC Road Hierarchy v28(DOCX, 73KB)

Planning Scheme version 27 (25 February 2022)

PDF documents

Citation and Commencement v27(PDF, 321KB)

Part 01 About the PS v27(PDF, 360KB)

Part 02 State planning provisions v27(PDF, 124KB)

Part 03 Strategic Framework v27(PDF, 511KB)

Part 04 Local Government Infrastructure Plan v27(PDF, 307KB)

Part 05 Tables of assessment v27(PDF, 3MB)

Part 06 Zone Codes v27(PDF, 5MB)

Part 07 Local plans v27(PDF, 6MB)

Part 08 Overlays v27(PDF, 3MB)

Part 09 Development codes v27(PDF, 17MB)

Part 10 Other plans v27(PDF, 99KB)

Sched 1 Definitions v27(PDF, 568KB)

Sched 2 Mapping v27(PDF, 118KB)

Sched 3 Local government infrastructure plan mapping and tables v27(PDF, 485KB)

Sched 4 Notations required under the Planning Act 2016 v27(PDF, 223KB)

Sched 5 Designation of premises for development v27(PDF, 243KB)

Sched 6 PSP1 Development Application Requirements v27(PDF, 2MB)

Sched 6 PSP2 Engineering Standards Roads and Drainage Infrastructure v27(PDF, 10MB)

Sched 6 PSP3 4 5 6 7 & 8 v27(PDF, 4MB)

Sched 7 Approved Plans of Development v27(PDF, 186KB)

Appendix 1 Index and glossary of abbreviations and acronyms v27(PDF, 218KB)

Appendix 2 Table of amendments v27(PDF, 198KB)

Appendix 3 TRC Road Hierarchy v27(PDF, 109KB)

Microsoft Word documents

Citation and Commencement v27 (PDF only)

Part 1 About the PS v27(DOC, 422KB)

Part 2 State planning provisions v27(DOC, 115KB)

Part 3 Strategic Framework v27(DOC, 382KB)

Part 4 Local Government Infrastructure Plan v27(DOCX, 119KB)

Part 5 Tables of assessment v27(DOCX, 473KB)

Part 6 Zone Codes v27(DOC, 60MB)

Part 7 Local plans v27(DOCX, 5MB)

Part 8 Overlays v27(DOC, 6MB)

Part 9 Development codes v27(DOCX, 10MB)

Part 10 Other plans v27(DOCX, 71KB)

Sched 1 Definitions v27(DOCX, 215KB)

Sched 2 Mapping v27(DOC, 106KB)

Sched 3 Local government infrastructure plan mapping and tables v27(DOCX, 188KB)

Sched 4 Notations required under the Planning Act 2016 v27 (PDF only)

Sched 5 Designation of premises for development v27 (PDF only)

Sched 6 PSP1 Development Application Requirements v27 (PDF only)

Sched 6 PSP3 4 5 6 7 & 8 v27(PDF, 4MB)

Sched 7 Approved Plans of Development v27(DOC, 104KB)

Appendix 1 Index and glossary of abbreviations and acronyms v27(DOC, 149KB)

Appendix 2 Table of amendments v27(DOC, 149KB)

Appendix 3 TRC Road Hierarchy v27(DOCX, 73KB)

Planning Scheme version 26 (30 April 2021)

PDF documents

Citation and Commencement v26(PDF, 322KB)

Part 1 About the PS v26(PDF, 405KB)

Part 2 State planning provisions v26(PDF, 125KB)

Part 3 Strategic Framework v26(PDF, 519KB)

Part 4 Local Government Infrastructure Plan v26(PDF, 310KB)

Part 5 Tables of assessment v26(PDF, 3MB)

Part 6 Zone Codes v26(PDF, 5MB)

Part 7 Local plans v26(PDF, 5MB)

Part 8 Overlays v26(PDF, 2MB)

Part 9 Development codes v26(PDF, 17MB)

Part 10 Other plans v26(PDF, 99KB)

Sched 1 Definitions v26(PDF, 568KB)

Sched 2 Mapping v26(PDF, 118KB)

Sched 3 Local government infrastructure plan mapping and tables v26(PDF, 487KB)

Sched 4 Notations required under the Planning Act 2016 v26(PDF, 219KB)

Sched 5 Designation of premises for development v26(PDF, 233KB)

Sched 6 PSP1 Development Application Requirements v26(PDF, 2MB)

Sched 6 PSP2 Engineering Standards Roads and Drainage Infrastructure v26(PDF, 10MB)

Sched 6 PSP3 4 5 6 7 & 8 v26(PDF, 4MB)

Sched 7 Approved Plans of Development v26(PDF, 186KB)

Appendix 1 Index and glossary of abbreviations and acronyms v26(PDF, 218KB)

Appendix 2 Table of amendments v26(PDF, 197KB)

Appendix 3 TRC Road Hierarchy v26(PDF, 109KB)

Microsoft Word documents

Citation and Commencement v26(DOC, 896KB)

Part 1 About the PS v26(DOC, 370KB)

Part 2 State planning provisions v26(DOC, 116KB)

Part 3 Strategic Framework v26(DOC, 383KB)

Part 4 Local Government Infrastructure Plan v26(DOCX, 109KB)

Part 5 Tables of assessment v26(DOCX, 476KB)

Part 6 Zone Codes v26(DOC, 60MB)

Part 7 Local plans v26(DOCX, 5MB)

Part 8 Overlays v26(DOC, 6MB)

Part 9 Development codes v26(DOCX, 10MB)

Part 10 Other plans v26(DOCX, 72KB)

Sched 1 Definitions v26(DOCX, 202KB)

Sched 2 Mapping v26(DOC, 106KB)

Sched 3 Local government infrastructure plan mapping and tables v26(DOCX, 150KB)

Sched 4 Notations required under the Planning Act 2016 v26(DOCX, 87KB)

Sched 5 Designation of premises for development v26(DOC, 158KB)

Sched 6 PSP1 Development Application Requirements v26(DOC, 4MB)

Sched 6 PSP2 Engineering Standards Roads and Drainage Infrastructure v26(DOC, 15MB)

Sched 6 PSP3 4 5 6 7 & 8 v26(DOC, 9MB)

Sched 7 Approved Plans of Development v26(DOC, 105KB)

Appendix 1 Index and glossary of abbreviations and acronyms v26(DOC, 150KB)

Appendix 2 Table of amendments v26(DOC, 156KB)

Appendix 3 TRC Road Hierarchy v26(DOCX, 71KB)

Planning Scheme version 25 (22 January 2021)

PDF documents

Citation and Commencement v25(PDF, 405KB)

Part 1 About the PS v25(PDF, 405KB)

Part 2 State planning provisions v25(PDF, 124KB)

Part 3 Strategic Framework v25(PDF, 519KB)

Part 4 Local Government Infrastructure Plan v25(PDF, 310KB)

Part 5 Tables of assessment v25(PDF, 3MB)

Part 6 Zone Codes v25(PDF, 5MB)

Part 7 Local plans v25(PDF, 5MB)

Part 8 Overlays v25(PDF, 2MB)

Part 9 Development codes v25(PDF, 17MB)

Part 10 Other plans v25(PDF, 99KB)

Sched 1 Definitions v25(PDF, 567KB)

Sched 2 Mapping v25(PDF, 118KB)

Sched 3 Local government infrastructure plan mapping and tables v25(PDF, 487KB)

Sched 4 Notations required under the Planning Act 2016 v25(PDF, 211KB)

Sched 5 Designation of premises for development v25(PDF, 233KB)

Sched 6 PSP1 Development Application Requirements v25(PDF, 2MB)

Sched 6 PSP2 Engineering Standards Roads and Drainage Infrastructure v25(PDF, 10MB)

Sched 6 PSP3 4 5 6 7 & 8 v25(PDF, 4MB)

Schedule 7 Approved Plans of Development v25(PDF, 187KB)

Appendix 1 Index and glossary of abbreviations and acronyms v25(PDF, 218KB)

Appendix 2 Table of amendments v25(PDF, 192KB)

Appendix 3 TRC Road Hierarchy v25(PDF, 110KB)

Microsoft Word documents

Citation and Commencement v25(DOC, 896KB)

Part 1 About the PS v25(DOC, 369KB)

Part 2 State planning provisions v25(DOC, 116KB)

Part 3 Strategic Framework v25(DOC, 383KB)

Part 4 Local Government Infrastructure Plan v25(DOCX, 109KB)

Part 5 Tables of assessment v25(DOCX, 475KB)

Part 6 Zone Codes v25(DOC, 60MB)

Part 7 Local plans v25(DOCX, 5MB)

Part 8 Overlays v25(DOC, 6MB)

Part 9 Development codes v25(DOCX, 10MB)

Part 10 Other plans v25(DOCX, 70KB)

Sched 1 Definitions v25(DOCX, 201KB)

Sched 2 Mapping v25(DOC, 105KB)

Sched 3 Local government infrastructure plan mapping and tables v25(DOCX, 149KB)

Sched 4 Notations required under the Planning Act 2016 v25(DOCX, 83KB)

Sched 5 Designation of premises for development v25(DOC, 158KB)

Sched 6 PSP 1 Development Application Requirements v25(DOC, 4MB)

Sched 6 PSP 2 Engineering Standards Roads and Drainage Infrastructure v25(DOC, 15MB)

Sched 6 PSP 3 4 5 6 7 & 8 v25(DOC, 9MB)

Sched 7 Approved Plans of Development v25(DOC, 105KB)

Appendix 1 Index and glossary of abbreviations and acronyms v25(DOC, 148KB)

Appendix 2 Table of amendments v25(DOC, 152KB)

Appendix 3 TRC Road Hierarchy v25(DOCX, 72KB)

Planning Scheme version 1 to version 20

Versions 1 to 20 of the Toowoomba Regional Planning Scheme 2012 are no longer available online. For a copy of one or more of these versions, please call our Customer Service Centre on 131 872.

Historical planning schemes

Explore historical planning schemes for the region below. These planning schemes became historic 1 July 2013.

The version of the planning schemes provided here include all amendments made since it came into operation. Zone and regulatory (or overlay) maps are also available.

Historic Cambooya Planning Scheme

Cambooya Planning Scheme came into operation under the Integrated Planning Act 1997 on 29 October 2004 and applied to the Greenmount service area (former Cambooya Shire Council area) of the Toowoomba Regional Council.

Cambooya Planning Scheme(PDF, 2MB)

Cambooya Planning Scheme – maps(PDF, 4MB)

Historic Clifton Planning Scheme

Clifton Planning Scheme came into operation under the Integrated Planning Act 1997 on 24 February 2003 and applied to the Clifton service area (former Clifton Shire Council area) of the Toowoomba Regional Council.

Clifton Planning Scheme(PDF, 2MB)

Clifton planning scheme – maps(PDF, 3MB)

Historic Crows Nest Planning Scheme

Crows Nest Planning Scheme came into operation under the Integrated Planning Act 1997 on 30 May 2007 and applied to the Crows Nest and Highfield service areas (former Crows Nest Shire Council area) of the Toowoomba Regional Council.

Crows Nest Planning Scheme(PDF, 6MB)

Crows Nest Planning Scheme – maps(PDF, 36MB)

Historic Jondaryan Planning Scheme

Jondaryan Planning Scheme came into operation under the Integrated Planning Act 1997 on 3 May 2005 and applied to the Oakey service area (former Jondaryan Shire Council area) of the Toowoomba Regional Council.

Jondaryan Planning Scheme(PDF, 14MB)

Jondaryan Planning Scheme – maps(PDF, 6MB)

Historic Millmerran Planning Scheme

Millmerran Planning Scheme came into operation under the Integrated Planning Act 1997 on 1 December 2006 and applied to the Millmerran service area (former Millmerran Shire council area) of the Toowoomba Regional Council.

Millmerran Planning Scheme(PDF, 3MB)

Millmerran Planning Scheme – maps(PDF, 3MB)

Historic Pittsworth Planning Scheme

Pittsworth Planning Scheme 2003 came into operation under the Integrated Planning Act 1997 on 19 December 2006 and applied to the Pittsworth service area (former Pittsworth Shire council area) of the Toowoomba Regional Council.

Pittsworth Planning Scheme(PDF, 2MB)

Pittsworth Planning scheme – maps(PDF, 3MB)

Historic Rosalie Planning Scheme

Rosalie Planning Scheme came into operation under the Integrated Planning Act 1997 on 26 February 2008 and applied to the Goombungee service area (former Rosalie Shire council area) of the Toowoomba Regional Council.

Rosalie Planning Scheme(PDF, 4MB)

Rosalie Planning Scheme – maps(PDF, 7MB)

Historic Toowoomba Planning Scheme

Toowoomba Planning Scheme came into operation under the Integrated Planning Act 1997 on 11 April 2003 and applied to the Toowoomba service area (former Toowoomba City council area) of the Toowoomba Regional Council.

Toowoomba Planning Scheme(PDF, 39MB)

Toowoomba Planning Scheme – maps(PDF, 34MB)

Understand the planning scheme

The following information is provided to help you use the Toowoomba Regional Planning Scheme.

Technical guideline for new developments

The technical guideline provides a standard approach to interpreting and implementing the Toowoomba Regional Planning Scheme. It helps new developments implement optimal waste management requirements. It applies to all new developments in the Toowoomba region.

We assess developments that are required to submit a development application against this guideline.

For more information, see Technical guideline for new developments - general waste and recyclable waste storage and collection(PDF, 2MB).

Practice notes for Toowoomba Regional Planning Scheme

The Planning Scheme is written to be as clear as possible. We want to avoid interpreting and applying the provisions in different ways.

Practice notes make our interpretation of those provisions clear. They show how we apply the planning scheme consistently across the Region.

Use these practice notes to interpret and apply planning scheme provisions.

Terms and definitions

Assessment benchmarks: The assessment manager uses these benchmarks, or measures, when assessing a development application. They help the assessment manager decide whether the proposed development complies with the relevant codes. They operate with both code-assessable and impact-assessable applications.

Dwelling house: A residential home for a single household, including any secondary dwelling, such as a granny flat. It also includes outbuildings such as sheds and garages.

Dual occupancy: A residential premises for two households, with two homes (attached or detached) on a single lot, or separate lots with common property. It includes associated outbuildings.

Material change of use: We use this term to mean a development that:

  • starts a new use of the premises
  • re-establishes a use that has been abandoned
  • leads to a material increase in the intensity or scale of the use of the premises.

Practice note 1 – Zones/local plans/overlays

The Planning Scheme includes all land within a zone, which may also include a precinct. Some areas are also included in an overlay and/or a local plan.

Each of these has the potential to impact assessment levels.

Part 5.3 of the Planning Scheme identifies the process for determining a level of assessment, using this hierarchy:

  1. Determine the level of assessment identified by the zone/precinct.
  2. Determine whether a local plan changes the level of assessment in the zone/precinct.
  3. Determine whether the overlay changes the level of assessment in the zone/precinct (if no local plan applies) or the local plan.

Image of three levels that shows overlay at the top, local plan in the middle, and zone/precinct at the bottom

A level of assessment established by a local plan overrides a level of assessment established by a zone/precinct.

A level of assessment established by an overlay overrides a level of assessment established by a zone/precinct and/or local plan.

A local plan or overlay may ‘raise’ or ‘lower’ the assessment level of the layer below them in the hierarchy. For example, if the zone/precinct assessment level is code assessable, a local plan or overlay might ‘raise’ the assessment level to impact assessable or ‘lower’ it to accepted development.

Practice note 2 – Development in the Neighbourhood Character Overlay (NCO)

The purpose of the Neighbourhood Character Overlay (NCO) is to conserve and enhance buildings and streetscapes that contribute to the character of the local area. It ensures new development is sympathetic to the nature and character of those predominantly residential areas.

The NCO has a corresponding Planning Scheme code that includes development controls and assessment benchmarks. It addresses the design, aesthetics and amenity requirements of the buildings and structures that might be proposed.

It doesn’t deal with the way the land is used – the zone deals with that.

The NCO also identifies specific properties considered to be significantly important to the local character. These are identified as Neighbourhood Character Places in Schedule 6 of the Planning Scheme under Planning Scheme Policy No.7.

Development

The NCO is an assessment benchmark for development within the NCO area. Development generally has two main components, construction and use.

Construction

'Construction' refers to buildings and other structures that might be built.

Additions, extensions and new ancillary structures (including sheds and carports) generally do not materially change how the site is used. We consider these ‘building works’. We assess them against the Planning Scheme through either:

  • a concurrence response to us for amenity and aesthetics, i.e. building applications are referred to us by the assessing building certifier for our consideration
  • an application for building works assessable against the Planning Scheme Works (PSW).
Use

'Use' is based on how land is used.

We assess new buildings, including dwelling houses and dual occupancies, as a Material Change of Use (MCU) application. They are assessable against the NCO code.

We may apply other benchmarks depending on the level of assessment in the Planning Scheme. For example, we would generally consider an extension to a dwelling house to be building works and not an MCU as it doesn’t change the use on site.

Amendment No.11 to the Planning Scheme modified the Planning Scheme so that we assess dwelling houses and dual occupancies as an MCU rather than building works. This ensures we consider the requirements of the code before we consider a building permit.

Determining level of assessment

You can determine the assessment level for development in the NCO for both MCO and PSW applications.

MCU
  • Determine the development and assessment category under the relevant zone/precinct.
  • Determine whether an NCO Overlay changes the development and assessment category.
PSW

Planning Scheme Work (PSW) also known as Building Work Assessable Against the Planning Scheme.

  • Identify whether the property is in a Neighbourhood Character Place as listed in Schedule 6 - Planning Scheme Policy No.7. This may affect the level of assessment.
  • Determine the level of assessment for the building work under the table of assessment for building work, Part 5.7 Table 5.7:1

Practice note 3 – Level of assessment (boundary realignments)

Under Part 5.6 Table 5.6:1 (Table of Assessment – Reconfiguring a lot), reconfiguring a lot is an accepted development if you are rearranging a lot’s boundaries by registering a plan of subdivision and:

  • no additional lots are created
  • none of the resulting lots is a hatchet lot
  • the size of all proposed lots is equal to or greater than the relevant minimum lot size for the zone as identified in Table 5.6:2.

We consider this to be a boundary realignment.

If your development doesn’t meet these conditions, the level of assessment will change.

  • When the boundary rearrangement creates extra lots, we will consider the development a subdivision.
  • When all the lots that result from rearranging the boundaries don’t meet the minimum lot size requirements for the applicable zone or precinct, it requires an Impact Assessment.

Example:

Two existing lots in the Rural Residential Zone (4000m² Precinct). Both lots have an area of 5000m². The proposal is to realign the boundary between the two lots to create one lot of 2000m² and one lot of 8000m². The minimum lot size for this zone is 4000m².

Because of the qualifier that requires the size of all lots to be equal to or greater than the minimum lot size identified in Table 5.6:2, this proposal would be an impact assessable development.

Read more about realigning boundaries.

Practice note 4 – Determining overlay boundaries

When it comes to boundaries there are two types of overlays:

  1. Property-based overlays that have boundaries that align with property boundaries – for example, Heritage Overlay and Neighbourhood Character Overlay.
  2. Overlays based on features that don’t align with property boundaries – for example Bushfire Hazard Overlay and Agricultural Land Overlay.

If you propose a development on land where an overlay applies, your development application must address the corresponding overlay code.

Sometimes, a property is partially covered by an overlay. In this case, the overlay code only applies to a development located within the part the overlay covers.

If you disagree with us about whether the proposed development is inside or outside the overlay, we will work with you to resolve the issue:

  1. You must produce a site plan that shows the envelope of your development, drawn to an identifiable regular scale.
  2. We will produce a site plan showing the location of the relevant overlay boundary, drawn to the same scale.
  3. Both plans will be overlaid to show the relationship between the development envelope and the location of the overlay.

Practice note 5 – Dwelling house vs dual occupancy

The Planning Scheme defines dwelling house, dual occupancy and secondary dwelling as follows:

Dwelling house means a residential use of premises involving either:

  • one dwelling for a single household and any domestic outbuildings associated with the dwelling
  • one dwelling for a single household, a secondary dwelling and any domestic outbuildings associated with either dwelling.

Dual occupancy means a residential use of premises for 2 households involving:

  • two dwellings (attached or detached) on a single lot or two dwellings (attached or detached) on separate lots that share a common property
  • any domestic outbuilding associated with the dwellings.

It does not include a residential use of premises that involves a secondary dwelling.

Secondary dwelling means a dwelling on a lot that is used in conjunction with, but subordinate to, another dwelling on the lot, whether or not the dwelling is:

  • attached to the other dwelling
  • occupied by individuals who are related to, or associated with, the household of the other dwelling.

Dwelling house vs dual occupancy

The above definitions blur the line between what is a ‘dwelling house’, where a secondary dwelling is also included, and what is a ‘dual occupancy’.

If both uses are accepted development in the Planning Scheme, you might not need to distinguish between the two for assessment purposes.

Sometimes, however, you will need to distinguish between the two. For example, in a zone where a dwelling house is accepted development and a dual occupancy is impact assessable.

In this case, refer to the following distinguishing elements.

A dwelling house, including the secondary dwelling, must be occupied by the same household, defined by the Planning Scheme as one or more people who:

  • live in a dwelling with the intent of living together on a long-term basis
  • make common provision for food and other essentials.

Therefore, a development proposing two dwellings occupied by two households will be considered a dual occupancy.

A secondary dwelling must be used together with the primary dwelling. This means they must be:

  • occupied by one household, including multi-generational living arrangements.
  • in close proximity to each other.

In an urban environment, any two dwellings on one lot are considered to be within close proximity to one another. Within the Rural Zone, Rural Residential Zone or Emerging Community Zone, the dwellings will typically be within 30 metres apart.

A secondary dwelling must be ‘subordinate’ to the primary dwelling. The distinguishing factor is size. The secondary dwelling should be smaller in gross floor area than the primary dwelling.

Summary

Two dwellings on a lot will be considered a ‘dwelling house’ where all of the following are met:

  • typically, both dwellings are occupied by the same household
  • a secondary dwelling is being added to a lot already containing a dwelling
  • the secondary dwelling has a smaller gross floor area than the primary dwelling
  • both dwellings are close to each other.

Generally, two dwellings on a lot will be considered a ‘dual occupancy’ in all other circumstances.

This information is a guide only. Assessment managers use their discretion to evaluate each circumstance on its merits.