Road closures will be in place for the Toowoomba Carnival of Flowers, Grand Central Floral Parade on Saturday 19 September, from 5.30am to 3pm.
The 'Water and wastewater electrical assets guideline' outlines the process for the delivery of Electrical and Control System (ECS) works for water and wastewater assets by developers. This arrangement allows proponents to construct electrical and control systems on our behalf, ensuring compliance with all applicable standards and requirements.
Open Water and wastewater electrical assets guideline(PDF, 1MB)
ECS requirements for water and wastewater assets are specified in the following documents and standards:
Copies of these documents are available on request. Please email us to receive a copy.
The purpose of this guideline is to:
This guideline will: