Dump truck emptying load of waste

A new weighbridge is required at the Clifton Waste Management Facility to comply with Queensland State stipulations associated with the landfill levy.

$30,000 is budgeted in 2021/22 for the design works. The weighbridge will be installed in a future year.

Design start date

July 2021.

Design target completion date

June 2022.